Eurocode LM1 temporary bridge in Żabno, Poland
After initial assembly of the 30m sections in our workshops in Hank, the Netherlands, they were transported and installed in Żabno in the Podkarpackie province. The entire operation of placing the prepared bridge sections on previously prepared abutments took less than 2 hours and involved minimal traffic disruptions. The JSB1 single-span temporary bridge with dimensions of 30 m in length and 7 m in usable width will handle class II traffic (100% Eurocode LM1) until the renovated crossing along DW856 is put back into operation.
Einzelheiten zum Projekt
Lösungen
Plattenträgerbrücke
Typ
JSB
Länge
30m
Breite
7m
Tragkraft
100% Eurocode LM1 / kl.II