JFB bridge as railway station platform access
As a part of revitalization of a railroad in Cieszyn, Poland, new station Cieszyn - University was planned by the Polish Railways (PLK PLK). To access its platform from Kazimierza Brodzińskiego street, a pedestrian bridge was needed due to environment protection requirements. JFB access bridge was selected by the general contractor and delivered within 3 months from order. It includes specific features corresponding PKP PLK requirements, such as leading path.
Projectdetails
Oplossing
Fiber Reinforced Bridges
Type
JFB
Lengte
9m
Breedte
2m
Gewicht
3000 kg
Belasting
Eurocode LM4
Materiaal brug
Fibre-reinforced polymere
Slijtlaag
Epoxy resin, anti-slip