Flyover bridge for special transports in Żarnowiec

As part of the logistics operation carried out by UTC Overseas for the delivery of transformers weighing 354t and shunt reactors weighing 135t from Gdynia to Osiek Lęborskie, the JSK450 beam bridge was used to increase the parameters of the existing crossing in Żarnowiec (Pomeranian Voivodeship) as a bridge above the existing bridge (so-called flyover). The crossing, 35m long (with ramps) and 5.7m wide, was completed in just 3 hours.

Deel op:

Projectdetails

Oplossing
Balkbrug
Type
JSK-JBB
Lengte
35m
Breedte
5,7m
Belasting
Special vehicle c.400t, local public traffic
Balkbrug

Uitgelicht

Project

To unload oversized cargo - transformers weighing several hundred tons - in the port of Władysławowo, our Client decided to use a JSK system bridge wi...
Balkbrug (JSK-JBB)
Oplossing

Balkbrug (JSK-JBB)

Jansons balkbruggen (JSK) zijn ontworpen voor een relatief korte vrije overspanning tot maximaal 21 meter. De balkbrug wordt vaak ingezet als tijdelij...